Home
Up

 

Witches Woods Tax District

Board of Directors and Flood and Erosion Control Board Meeting

May 12th, 2010

 

Members present:   Eric Werstler, Cliff Moon and Rande Chmura, Keith Pezzetti, Jack Gibbs, Steve Heath and Tom Pandolfi.  Absent: Glen Humes, Margaret Houlihan Others Present: Fred Chmura.

 

Clerks Report:

A motion was made by Rande Chmura and seconded by Tom Pandolfi to accept the minutes from the May 12th meeting.  The motion was approved unanimously.

 

Health, fire and safety:

Speed bumps will be installed at the “T”.  

A letter requesting police patrol will be sent to the state police.

 

Roads:

Tom Pandolfi reported that the catch basin in front of the Lucenti’s house will excavated to see if it is leaking.

Sink holes have appeared in the Lucenti’s yard.  

Tom will work with J & A construction to block the end of Olde Stone Road .  This will prevent ATV traffic.

The catch basins will be cleaned again this year. 

 

Treasurer’s Report:

Rande Chmura reviewed the May financial report. 

The finances are in good shape – we may have a slightly larger surplus than anticipated.

 

Lake , Dam and Beach:

Eric Werstler reported that he has retained the same person as last year to mow the dam.  The cost is $850 per mowing.  Two mowings this year are anticipated.

The low level outlet gate is not closed completely at the suggestion of the engineer.

Aquatic Control inspected the weeds in the cove and reported that they are better than in the past few years.   

They expect to treat the lake the second week of July.  Tom Pandolfi volunteered to post signs – no water use on treatment day.

Huteng’s Beach brush removal will be done at a cost of $450.  This project will remove only a portion of the debris as much more has been dumped since the original estimate. 

 

Next meeting – July 13th

A motion to adjourn the meeting was made, seconded and carried unanimously.

Respectfully submitted,

Cliff Moon

Clerk